Cutting Infrastructure Provisioning from Days to an Hour
July 22, 20265 min read
The technical automation was the easy 20%. The hard 80% was getting every downstream team to trust a system they didn't build, and retiring the manual process without a painful transition period.
This is a placeholder post — swap in your own breakdown of the automation architecture, the rollout strategy, and the before/after metrics.